Ordinex

Demolition forms that read like your day.

Demolition and abatement crews: hazardous materials, structural collapse and buried-service safety content, strip-out to structural FLRA tasks, pre-demolition readiness and containment records, and completeness quality checks. The full library ships the moment you pick Demolition & Environmental at signup — researched from real job-hazard analyses, not a generic template. Here's a sample.

A sample of the real content.

Pulled straight from the Demolition & Environmental pack — 6 tailgate hazards, 12 FLRA tasks and 12 quality checks in total. The full library is yours on day one of the trial.

Daily Tailgate

Demolition & Site Conditions

Trade-specific hazards added to every morning meeting form.

  • Hazardous Materials Survey Reviewed
  • Utilities Confirmed Disconnected
+ 4 more hazards in the pack
FLRA — Field Level Risk Assessment

Task hazard library

Crews pick today's tasks; hazards, risk level and controls come pre-filled.

Pre-demolition survey & utility verificationHigh
Underground Utilities · Asbestos / Hazardous Materials
Controls: 4 pre-filled in the app
Soft strip / interior demolitionMedium
Exposure to Dust · Falling Debris · Working with Hand Tools
Controls: 4 pre-filled in the app
+ 10 more tasks in the pack
Quality — QAQC checks

Inspection checklist

The checks a demolition & environmental inspection actually needs.

  • Demolition limits match drawings — nothing removed outside scope
  • Structures to be retained protected and undisturbed
  • Temporary supports installed per engineer before removal
+ 9 more checks in the pack

These are starting templates, researched from real job-hazard analyses — every company reviews and adapts them with its own safety advisor before use.

Beyond the safety forms — the business side of demolition & environmental.

The Demolition & Environmental pack also unlocks two trade forms: a Pre-Demolition Readiness Check that holds the job until the hazardous materials survey is in hand and every utility is proven dead, ending in a signed READY or NOT READY call — and an Abatement Containment Daily Log with the negative pressure reading, enclosure and decontamination checks, and a containment sound or breached determination for the shift.

The whole platform comes with it.

Every pack runs on the same app: a 40-form catalog that works offline — filtered to your trade — signed and locked records, deliveries, crew scheduling, equipment & rentals, project documents, corrective actions and GC-ready compliance reports.

Run tomorrow's tailgate with the Demolition & Environmental pack.

14 days free. No credit card, no demo call.

Start your free trial